* At 1:40 p.m. (MT) on April 27 , there was a contractor
fatality at Williams’ Redwater Olefinic Fractionator in
Redwater, Alberta
The post BRIEF-Pembina Pipeline says there was a fatality at Redwater facility on April 27 appeared first on NASDAQ.